Roofing for Developers, General Contractors, and Architects

Roofing sets the dry-in date. Details, equipment locations, and trade sequencing need to be buildable before crews reach the field.

Quantum bids as a roofing subcontractor. We also review details and drainage with owners, developers, and architects before bid.

Early review can catch tight curb clearances, poor drainage locations, and tie-ins that are difficult to build or warrant.

Project coordination

  • Bid scope that can be compared across roofing subcontractors
  • Dry-in dates and the trades waiting behind them
  • Equipment set schedules and the flashing that follows them
  • Detail review before the drawings go out
  • Submittals, mock-ups, and inspection requirements
  • Closeout, warranty registration, and as-built documentation
Quantum crew working on a developers, general contractors, and architects roof

Preconstruction input

Before bid, questions about drainage, curb clearance, and addition tie-ins can be resolved in the drawings.

After steel and equipment are set, those same conflicts can change the schedule and cost.